HOME           ABOUT US        SERVICES         PROJECTS            NEWS           CONTACT

PROJECTS

   

 

Specific tasks included working with site engineers to develop the Master Drainage Plan (including a system of detention and infiltration ponds), evaluating water quality and hydrologic impacts of the development on wetlands including a sensitive Sphagnum bog, developing conceptual and final mitigation plans and construction documents to compensate for impacts from roadways and other impervious features, designing interpretive signs for the educational overlook, and many other tasks.

As for other projects of this size, we prepared U.S. Army Corps of Engineers and Washington Department of Ecology permit applications and coordinated with agency representatives to generate a successful project for all concerned.

 

 

Project Statistics:

Location:  Snoqualmie, WA

Client:      Quadrant Homes

Size:        760 Acres

Date:       1999 - present

 

Snoqualmie Ridge II             Wetland and Buffer Mitigation

Raedeke Associates has been associated with this planned development for almost 20 years.  From initial site observations and EIS work through stream and wetland delineations, to mitigation monitoring, we have provided wetland, wildlife, and habitat consultations for the project proponents to assist them with navigating through regulatory constraints at the local, state, and federal level. 

 

5711 Northeast 63rd Street  Seattle, Washington 98115   (206) 525-8122